Edited by Dr Francesca Bernassola Rights and permissions Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made
Easy tolerance from the first application, with no adjustment period needed, might indicate starting concentrations below your skin's capability
2009 Jun Cara T Hoepner, Roger S McIntyre, George I Papakostas
La extrapolacin de estas dosis al ser humano, utilizando los factores de conversin alomtricos estndar (factor de 6,2 para la rata), da dosis tericas del orden de 1,6 g/kg en humanos

Construction Item Remaining Unit Price Totals Clear and Grub Erosion and Sedimentation Control Measures -- Install and Maintain throughout construction Rock Excavation -- Area and Trench Construct roadways to subgrade Subgrade Stabilization Gravel subbase Processed gravel base Bituminous Concrete Base or Binder Course Bituminous Concrete Top Course Curbs or Berms Sidewalks, Curb Ramps, Bikeways, and Paved Driveway Aprons to Edge ROW Storm Drainage Main Piping and Cross Culverts Catch Basins or Drop Inlets with Frames, Grates, Curb Inlets, etc Drain Manholes Drain Outlet Pipe Ends and Scour Aprons Drainage Swales, Vegetated or Rock-lined Stormwater Basins and Drainage Mitigation/Control Structures Storm Drain Service Pipes to Lots -- (For Footing Drains, Roof Leaders, etc) Wetlands Protection and Mitigation Measures Sanitary Sewer Main Piping Sanitary Sewer Manholes Sanitary Sewer Service Pipes to Lots Sewage Pump System or Alternative Sewage Disposal System Water Main Piping and Thrust Restraints Water Valves Fire Hydrants and Blowoffs Water Service Pipes and Curb Stops to Lots Z:\documents\Wpdocs\E1573 Lee Subd Regs\final 2-2-04\form d-2 const cost estimate.xls 02/02/2004 Form D-2 Page 1 of 2
